HAML-Hyderabad Metro Rail Project Phase-II- Corridor-VI-Conducting utility probing for metro rail works at proposed metro stations by cutting the road, capturing utility details and submission of reports between Darulshifa and Chandrayangutta
Ai Generated Article,
Bill of Quantity Items Print Preview
Current Tender Details
Tender ID
614844
Enquiry/IFB/Tender Notice Number
NIT.No.03/EE/HAML/2025-26 Dt: 19.07.2025
Name of Work
HAML-Hyderabad Metro Rail Project Phase-II- Corridor-VI-Conducting utility probing for metro rail works at proposed metro stations by cutting the road, capturing utility details and submission of reports between Darulshifa and Chandrayangutta
Tender Category
Works
Tender Type
OPEN – NCB
Estimated Contract Value
4027564
Bid Submission Closing Date
30/07/2025 04:00 PM
Tender Evaluation Type
Percentage
Back Print
BOQ Item Details
S.No
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
1
Probing
As per data
400.00
Each
1000.00
400000.00
Supply, delivery of cement concrete counter weights to site including loading, unloading etc complete finished item of work as directed by Engineer- In-Charge.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
2
Probing
As per data
12.00
Perday
7000.00
84000.00
Engaging DCM vechile for shifting of barrication boards including all hire charges, fuel driver etc complete finished item of work as directed by Engineer- In-Charge.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
3
Probing
As per data
120.00
Nos
805.00
96600.00
Engaging labour for shifting of barrication boards etc complete finished item of work as directed by Engineer- In-Charge.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
4
Probing
As per data
120.00
Sqm
750.00
90000.00
Supply, delivery and fixing of solar blinkers with mesh guard of approved quality to the MS barrication board including cost and covenyance of materials, incidentals, labour charges etc complete for finished item of work as directed by the Engineer-In-Charge.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
5
Probing
As per data
65.00
Each
3000.00
195000.00
Providing mapping of utilities observed in Autocad drawing with co-ordinates with all details such as type of utility, diameter and all other features along with submission of colour plan in three sets etc complete finished item of work as directed by Engineer- In-Charge.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
6
Probing
As per data
312.00
Cum
160.30
50013.60
Carting of surplus excavated rock / earth from the site to a distance of 10.00 Kms suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
7
Probing
As per data
936.00
Cum
47.25
44226.00
Filling of available excavated useful earth in trenches with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
8
Probing
As per data
93.60
Cum
1094.65
102459.24
Supply and filling of HBG stone chips of size 2.36m & below in trenches with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
9
Probing
As per data
124.80
Cum
7407.30
924431.04
Providing P.C.C. grade M 20 (Design Mix) MORTH 12.8 B using 20 mm Graded Metal in open foundations using 20 mm nominal size Graded Metal stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
10
Probing
As per data
187.20
Cum
6369.28
1192329.22
Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
11
Probing
As per data
1060.80
Cum
451.81
479280.05
Earthwork in excavation for trenches as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN- 1 -Manual means)
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
12
Probing
As per data
93.60
Cum
1280.44
119849.18
Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
Cutting of BT Road surface including cost and conkveyance of all material complete item of work. (PH Item 25(a))
Subwork Name
Specification Number
Quantity
UOM
Rate(INR)
Amount(INR)
13
Probing
As per data
93.60
Cum
2664.27
249375.67
Cutting open CC road surface including stacking of excvated materials & etc., complete for paver work (PH Item 25(b))